step four
Rig backed onto mats to access borehole.
Beginning of horizontal pipe trenching, and mobilization of mini excavator, also calls for reinforced mat placement. read more
Mats have also helped to catch mud and keep the yard mess to a minimum. Note silt fence in... read more
After loops are installed and rig is pulled out of driveway, crew hoses and scrubs down the driveway. read more
Beginning yard restoration after a rough grade with mini excavator and hand rake by the crew. read more
After a couple months, your yard will look just as it had before the drilling. read more
Allied performs a site check prior to all geothermal jobs to address any and all concerns a customer might... read more
Reinforced mats are placed in an overlapping fashion to help distribute the weight of the drill rig, reducing the... read more
Finished yard restoration with straw laid for erosion protection and to facilitate seed growth, and no changes to existing... read more